Skip to main content
Palmetto Plastics

Why Fall Is the Time to Inspect Your Cooling Tower Fill

Fall and winter are re-pack season. Here's why to inspect cooling tower fill after the summer peak, what to look for, and how to plan a replacement before spring.

Cooling tower cells with new fill installed

Summer is when a cooling tower works hardest. Long run hours, high heat loads and warm water all speed up fouling, scale and biological growth in the fill. By the time cooling demand drops in the fall, many towers have lost capacity that no one noticed during the rush.

That makes fall the best time to look. The tower can usually be taken down for inspection without hurting operations, and there is still time to order and install new fill before the next cooling season.

What to look for

  • Fouling and scale. Mud, silt, scale or biological slime packed into the flutes blocks air and water. Fouled fill also gets heavy, which puts extra load on the supports and structure.
  • Sagging or collapsed packs. Fill that has dropped, sagged or broken apart lets water and air bypass the pack, so that part of the tower does no cooling.
  • Brittle or broken sheets. Sheets that crack or crumble when touched are at the end of their life.
  • Uneven water distribution. Dry spots on top of the fill often point to clogged, broken or missing nozzles, not the fill itself.
  • Gaps around the edges. Open gaps at walls and columns let air skip the fill. Seals that have failed are cheap to replace and quick to recover performance.

Why a winter re-pack makes sense

Fall and winter are re-pack season for good reason. Cooling loads are low, outage windows are easier to schedule, and the work is finished before peak demand returns. Planning early also gives you time to choose the right fill for your water: a fouled tower may be a sign it needs a more fouling-resistant design, not just a like-for-like swap.

Choosing replacement fill

Water quality should drive the choice:

  • Clean, well-treated water (under 25 ppm TSS): high-efficiency cross-fluted fill such as PCF1200 or PCF1900.
  • Moderate suspended solids (under 200 ppm): POF.
  • Dirty or variable water (under 500 ppm): PVC20 anti-fouling fill.

Common fill products are kept in stock and ship from our South Carolina plant. Request a quote with your model number and tower details, and we'll help you plan the re-pack.

More from the blog

Ready to spec your next rebuild?

Send us your tower details and water quality. Our team will recommend the right fill, drift eliminators and parts, and get you a quote fast.